U.S. flag

An official website of the United States government

Frequently Asked Questions

Frequently Asked Questions are used to provide additional information and/or statutory guidance not found in State Medicaid Director Letters, State Health Official Letters, or CMCS Informational Bulletins. The different sets of FAQs as originally released can be accessed below.

Showing 1 to 6 of 6 results

Our state uses multiple cost centers (routine and ancillary) in the calculation of our inpatient hospital Upper Payment Limit (UPL). Do the templates permit the use of multiple cost centers?

Yes, the templates allow the use of multiple cost centers. For example, if the state uses a cost methodology for ancillary services and a per-diem methodology for routine services, the state will complete one cost template and one per-diem template in order to account for these two cost centers. Every hospital would be featured in each of the two templates; however, to differentiate their provider information, the state would append the Medicare Certification Number (Medicare ID) (variable 112) with a letter, such as an -A or a -B. For example, if the Medicare ID was 123456, it would be depicted in the cost template as 123456-A and in the per diem template as 123456-B. If a Medicare Certification Number is not available then the state should append the Medicaid Provider Number. If there are multiple cost centers under either the cost or per-diem methodology, the state would separate out the cost centers within their respective templates. Each cost center should be associated with only one appended letter and these should be described in the notes tab. When using multiple cost centers, the state should insert a new tab in the templates that summarizes the UPL gap calculations for each of the ownership categories (state government owned, non-state government owned, and private), unless a summary worksheet is already included in the workbook.

FAQ ID:92261

SHARE URL

Our state covered institutions for mental disease (IMD) under the inpatient hospital and nursing benefit. Should we conduct a separate UPL for these facilities?

No, facilities that are licensed, covered, and paid under the Medicaid state plan as inpatient hospital or nursing facilities should be included in the UPL calculated for those services. There is no regulatory requirement to conduct separate calculations for designated facility "types" within each of the applicable service categories. States do not need to provide separate UPL demonstrations for IMDs covered under the inpatient hospital or nursing facility services benefit.

FAQ ID:92381

SHARE URL

Based on CMS guidance, states may take up to 18 months to bring an IV&V contractor on board to perform certification tasks or align current IV&V contract to comply with CMS guidance pertaining to scope of services and financial independence. What must the state do if the IV&V contractor's start up is delayed?

IV&V contractor activities must still be performed such as checklist evaluation, artifact review and preparation of IV&V Progress Reports. The state should provide a plan and timeline for how these activities will be supported and performed until the proper IV&V contract can be either procured or aligned with updated CMS guidance on IV&V.

FAQ ID:94866

SHARE URL

Is IV&V required during operations and maintenance (O&M) for MMIS?

As contained in the MECT standard RFP/contract language required by CMS, CMS does not cover activities that the state may require of the IV&V contractor during ongoing O&M. However, as Medicaid is moving away from monolithic single applications, it is expected that states will continuously update and replace modules in their enterprise. Therefore, IV&V should always have a role to ensure successful integration and testing.

FAQ ID:94881

SHARE URL

What would preclude a company from being eligible to bid on the MMIS or E&E IV&V contract(s)?

If an organization is performing another role (such as systems integrator, PMO, quality assurance, etc.) on the MMIS or E&E project, it may not perform the IV&V function on the same project. A state may contract the same vendor to perform the IV&V role for both its E&E and MMIS projects.

FAQ ID:94886

SHARE URL

Why does the IV&V contractor need to sit outside the Medicaid agency?

To reduce potential conflict of interest, CMS is ensuring that states are arranging IV&V services through contracts that should be owned outside of the agency that owns the MMIS or E&E project. The oversight organization for the IV&V contractor should not be involved in oversight of the development effort, a stakeholder in the business implementation, or the DDI contractor. The IV&V contract monitor should be aware of system development problem solving, reporting, and contractor management. This contract oversight provides true independence between the IV&V contractor and system development teams. This requirement is consistent with other HHS agencies' practices and industry best practices.

FAQ ID:94891

SHARE URL
Results per page