U.S. flag

An official website of the United States government

Frequently Asked Questions

Frequently Asked Questions are used to provide additional information and/or statutory guidance not found in State Medicaid Director Letters, State Health Official Letters, or CMCS Informational Bulletins. The different sets of FAQs as originally released can be accessed below.

Showing 11 to 20 of 37 results

Are states required to use the Outpatient Hospital Serves (OPH) Upper Payment Limit (UPL) template to demonstrate the clinical diagnostic laboratory (CDL) services UPL?

No, the template does not include variables to report clinical diagnostic laboratory services.

FAQ ID:92371

SHARE URL

What information does CMS expect to be included in the Notes tab?

The Notes tab should include any and all information to fully support the state's UPL demonstration. CMS expects states to provide clarifying information in the Notes tab. For example, this information would provide details for the adjustments to Medicare as input in variables 212.1 and 212.2, various supplemental payments in variables 313.1, 313.2, and 313.3, and adjustments to Medicaid in variables 314.1 and 314.2. In addition to reporting through the notes tab, the state also has the option of using the guidance document or narrative to fully support its UPL demonstration.

FAQ ID:92376

SHARE URL

Our state covered institutions for mental disease (IMD) under the inpatient hospital and nursing benefit. Should we conduct a separate UPL for these facilities?

No, facilities that are licensed, covered, and paid under the Medicaid state plan as inpatient hospital or nursing facilities should be included in the UPL calculated for those services. There is no regulatory requirement to conduct separate calculations for designated facility "types" within each of the applicable service categories. States do not need to provide separate UPL demonstrations for IMDs covered under the inpatient hospital or nursing facility services benefit.

FAQ ID:92381

SHARE URL

Does CMS participate in the state's life cycle gate reviews?

No. CMS does not participate the state's in E&E or in MMIS system development life cycle (SDLC) level reviews.

FAQ ID:95056

SHARE URL

Does the IV&V 18-month compliance period apply to E&E systems?

Yes. The rules pertaining to procuring IV&V contracts (State Medicaid Director Letter 16-010) apply to both E&E and MMIS.

FAQ ID:95061

SHARE URL

Do the documents in the artifacts table need to be created for every module?

In most cases once they are created, the documents will simply be updated to account for the additional modules being planned or developed. A new document is not necessarily created for each module. If a state calls a document by a different name, the state should inform CMS of the name difference.

FAQ ID:95076

SHARE URL

CALT is no longer available. Where should state artifacts and evidence be posted?

Granting CMS direct access to the state's evidence repository is the preferred method for making evidence available to CMS. If that is not possible, the state may make other secure arrangements with CMS, such as using encrypted File Transfer Protocol (FTP). It is critical to follow all Health Insurance Portability and Accountability Act (HIPAA) regulations when submitting evidence that contains personal health information (PHI) and personally identifiable information (PII).

FAQ ID:95081

SHARE URL

Should IV&V progress reports include all the checklist sets every time they submit a progress report?

No. Only the checklists pertaining to the modules undergoing review need to be included, and that only for the report created in preparation for a milestone review. However, the IV&V progress report should include risks and recommendations for the entire project--not just those about to undergo a milestone review.

FAQ ID:95086

SHARE URL

Why are there Standards and Conditions (S&C) and Access and Delivery (A&D) criteria in the Information Architecture checklist?

When streamlining the core checklists (IA, TA and S&C checklists), we found that some criteria fit better in other checklists, so they were moved. To keep traceability simple for the states, we chose to keep the original identifiers for any criteria that were moved. The same holds true for criteria moved to the programmatic tab of the IV&V progress report template.

FAQ ID:95091

SHARE URL

Are Eligibility and Enrollment (E&E) systems now going to be certified the way MMIS systems are certified?

No, E&E systems are not subject to certification. Though the Medicaid Eligibility and Enrollment Toolkit (MEET) was based on the MMIS toolkit, the MEET was created as a way to align how CMS reviews Medicaid enterprise systems and is a means for CMS to provide technical assistance to the states.

FAQ ID:95096

SHARE URL
Results per page